{"product_id":"refurbishment-line-optimization-study","title":"Refurbishment Line Optimization Study","description":"\u003cp\u003eYour line runs. It produces. But you know — you \u003cem\u003efeel\u003c\/em\u003e — that somewhere in the sequence, there's a bottleneck. A station where work piles up. A step that takes too long. A handoff that loses units. You don't need someone to tell you where it is. You need someone to tell you how to fix it.\u003c\/p\u003e\u003cp\u003eThe Refurbishment Line Optimization Study is a deep-dive engagement. Over two weeks, a PBR process engineer works with your team to:\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eMap your current refurbishment process end-to-end\u003c\/strong\u003e — every station, every handoff, every decision point\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eCollect cycle-time data at each station\u003c\/strong\u003e — your team times it, we provide the data collection template\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eIdentify the throughput bottleneck\u003c\/strong\u003e and the secondary constraints behind it\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eModel the impact of potential solutions\u003c\/strong\u003e — add a station? re-sequence steps? batch vs. single-piece flow? parallelize testing?\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eDeliver a prioritized optimization plan\u003c\/strong\u003e with projected throughput gains and implementation difficulty\u003c\/li\u003e\n\u003c\/ul\u003e\u003cp\u003eYou receive: a current-state process map, a bottleneck analysis with data, a future-state process design with projected throughput, a ranked list of improvement actions (highest impact, lowest cost first), and an implementation roadmap with 30\/60\/90-day milestones.\u003c\/p\u003e\u003cp\u003eThis is what PBR does internally when we add a new line or scale an existing one. One study. One report. Enough information to double throughput — or at least to stop guessing about why Friday afternoons always back up at testing.\u003c\/p\u003e","brand":"PBR Manufacturing LLC","offers":[{"title":"Default Title","offer_id":48271682273433,"sku":"PBR-RLO-027","price":398.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0730\/9416\/8729\/files\/refurbishment-line-optimization-study.png?v=1782806854","url":"https:\/\/pbrfab.com\/products\/refurbishment-line-optimization-study","provider":"PBR Manufacturing LLC","version":"1.0","type":"link"}